As Lead Contractor for this project SCL undertook installation of all three waters including
180mm/125mm/63mm PE water main and 20mm domestic connections to lots, Sewer Main Construction and domestic connections, Stormwater Infrastructure Construction, New Kerbs, paths and Road pavement construction.
Installation of Water Infrastructure.
• Supply and welding of the new pipelines
• Connection of components including valves, hydrants and domestic connections including construction of 180mm, 125mm and 63 mm water main and lot connections
• All testing
• Chlorination and Pressure testing to HDC Standards.
Installation of Sewer and Stormwater Infrastructure:
• Construction of new Concrete Stormwater pipelines
• Construction of 150mm and 100mm uPVC Sewer mains and domestic connections
• Commissioning and Testing.
Pavement Construction
• Subbase Construction
• Concrete Kerbing
• Concrete Path Construction
• Basecourse Construction
• Chip seal Design and Asphalt Surfacing.